Primer Speakers / Neil Cranswick
Neil started his career with NEI Parsons, working on large turbo-generators at a number of locations in the UK and, following this, he joined the CEGB working at Drax Power Station (UK) and was also seconded to Hub River Power Station (Pakistan).
Neil left Drax in 1998 to join the Saltend CHP project (UK) and, following takeover of Saltend by International Power in 2006, spent over 7 years in the UAE in both Production and Plant General Manager roles. In 2014, Neil returned to the UK to take up the position of Outage Project Manager, followed by Station Manager at Rugeley Power Station. Following the closure of Rugeley, in 2016, Neil returned to the UAE to take up his current position.
Neil Cranswick
Shuweihat S1 power and desalination plant (UAE)
Plant General Manager